Hard Processor System Technical Reference Manual: Agilex™ 5 SoCs

ID 814346
Date 7/19/2024
Public

A newer version of this document is available. Customers should click here to go to the newest version.

Document Table of Contents

9.2. Power Management System Integration

The diagram below shows high-level connectivity to the power manager in HPS.

Figure 282. Power Manager Block Diagram

The power manager includes the following blocks:

  • Generic P-channel FSM to implement Arm-based P-channel spec. This is primarily used to manage the power down sequences for DSU cluster (CPU cores and L3 cache).
  • Hardware FSM to implement DSU and CPU core power-off scenarios and associated control, status registers.
  • Power-related control and status registers to support all power gating scenarios.