GTS Transceiver PHY User Guide

ID 817660
Date 7/08/2024
Public
Document Table of Contents

3.9.1. Bonding Placement Requirements

For the Agilex™ 5 bonding implementation, you must follow the channel placement guidelines shown in the following figure for the channels in the bonded groups (x2, x4, x6, and x8). In the figure, CH0-CH7 are the logical channel number of the various bonded groups.
Figure 60. Bonding Channel Placement Requirement Guidelines