Stratix® 10 SX SoC Development Kit User Guide

ID 683303
Date 6/06/2024
Public
Document Table of Contents

5.1. Preparing the Board

After successful FPGA configuration, with the power to the board off, follow these steps:
  • Connect the USB cable to your PC and the Intel® FPGA Download Cable II port.
  • Change SW1 and SW4 to the following configuration.
  • Turn on power to the board and run the Board Test System.
Note: To ensure operating stability, keep the USB cable connected and the board powered on when running the demonstration application.
Table 49.  SW1 GUI Mode
Bit 1 Bit 2 Bit 3 Bit 4 Bit 5 Bit 6 Bit 7 Bit 8
OFF OFF ON ON ON ON ON ON
Table 50.  SW4 GUI Mode
Bit 1 Bit 2 Bit 3 Bit 4
ON OFF ON ON