Hard Processor System Booting User Guide: Agilex™ 5 SoCs

ID 813762
Date 12/20/2024
Public
Document Table of Contents

2.1.1. Power-On Reset (POR)

Ensure you power each of the power rails according to the power sequencing consideration until they reach the required voltage levels. In addition, the power-up sequence must meet either the standard or the fast power-on reset (POR) delay time.