Agilex™ 7 FPGA M-Series HBM2e Development Kit User Guide

ID 782461
Date 5/14/2024
Public
Document Table of Contents

3.2. Powering Up the Development Kit

To power up the development kit, follow these steps:

  1. Use the provided 300 W power adapter to supply power through J12 and J3.
  2. After the power adapter is plugged into J12 and J3, and switch S7 is set to the ON position, DS15 LED illuminates, indicating that the board powered up successfully. If the LED (DS15) is not turned ON, it indicates that one of the voltage regulators is not turned on.
    Note:

    All the QSFPDD and QSFPDD800 ports can support up to class 8, meaning each port consumes 18 W. Two power supplies are needed to provide sufficient power for peak performance.

    The Agilex™ 7 FPGA M-Series HBM2e Development Kit can run the loop back test or memory test using only one power adapter connected to J12. Since one power adapter can provide 300 W maximum, the Agilex™ 7 FPGA M-Series HBM2e Development Kit can only run diagnostic tests.