10.7.1. Power-Up Sequence Requirements for Arria® 10 Devices
The power rails in Arria® 10 devices are each divided into three groups. Refer to the Arria® 10 GX, GT, and SX Device Family Pin Connection Guidelines and the AN692: Power Sequencing Considerations for Cyclone® 10 GX, Arria® 10, and Stratix® 10 Devices for additional details.
The diagram below illustrates the voltage groups of the Arria® 10 devices and their required power-up sequence.
Power Group | Arria® 10 Power Supplies |
---|---|
Group 1 | VCC VCCP VCCERAM VCCR_GXB VCCT_GXB VCCL_HPS |
Group 2 | VCCPT VCCH_GXB VCCA_PLL VCCPLL_HPS VCCIOREF_HPS |
Group 3 | VCCPGM VCCIO VCCIO_HPS |
All power rails in Group 1 must ramp up (in any order) to a minimum of 90% of their respective nominal voltage before the power rails from Group 2 can start ramping up.
The power rails within Group 2 can ramp up in any order after the last power rail in Group 1 ramps to the minimum threshold of 90% of its nominal voltage. All power rails in Group 2 must ramp to a minimum threshold of 90% of their nominal value before the Group 3 power rails can start ramping up.
The power rails within Group 3 can ramp up in any order after the last power rail in Group 2 ramps up to a minimum threshold of 90% of their full value.
For Arria® 10 devices, you can combine and ramp up Group 3 power rails with Group 2 power rails if the two groups share the same voltage level and the same voltage regulator as Group 2 power rail VCCPT.
All power rails must ramp up monotonically. The power-up sequence should meet either the standard or the fast Power On Reset (POR) delay time. The POR delay time depends on the POR delay setting you use. For the POR specifications of the Arria® 10 devices, refer to the POR Specifications section in the Arria® 10 Device Datasheet.
The power-up sequence must meet either the standard or fast POR delay time depending on the POR delay setting you use.