Hard Processor System Booting User Guide: Agilex™ 5 SoCs

ID 813762
Date 8/23/2024
Public

A newer version of this document is available. Customers should click here to go to the newest version.

Document Table of Contents

2.1.1. Power-On Reset (POR)

Ensure you power each of the power rails according to the power sequencing consideration until they reach the required voltage levels. In addition, the power-up sequence must meet either the standard or the fast power-on reset (POR) delay time.