Visible to Intel only — GUID: lft1729890371015
Ixiasoft
2.1. Step 1: Create an Exploration Dashboard Workspace
2.2. Step 2: Add Projects to Exploration Dashboard
2.3. Step 3: Launch Connections and Compile the Projects
2.4. Step 4: Import and Analyze Timing Summary Reports
2.5. Step 5: Analyze the Results of Report Timing
2.6. Step 6: Disconnecting Interactive Connections
Visible to Intel only — GUID: lft1729890371015
Ixiasoft
3.1.4. Step 4: Analyzing Databases in Offline Mode
To analyze imported compilation databases with Exploration Dashboard in offline mode, follow these steps:
- To define a group that allows interaction with the databases, double-click Create project group on the Tasks list. The Add Project Group dialog box opens.
- Enter a group name and select the projects to be added to the group by checking the checkbox for each project you want to add, or by clicking the Select All button.
- To merge and analyze the reports, double-click any of the tasks in the Analyze Reports folder. For example, Analyze All Reports is tailored for offline mode to identify and merge reports found in the imported databases.
Figure 32. Aggregate Timing Summaries Task
- In the Select Timing Summaries to Aggregate dialog box, turn on the appropriate group and set of reports for combination, and then click OK.
Figure 33. Select Timing Summaries to Aggregate Dialog Box
Exploration Dashboard consolidates results from the various databases you specify and displays the aggregated reports.
selecting a row in the top table, the bottom table will be populated
- In the consolidated report, select a row in the top table. The bottom table populates with further details about each report.
Figure 34. All_Seeds Timing Summary Hold (Merged) Report