Visible to Intel only — GUID: nug1729887355085
Ixiasoft
2.1. Step 1: Create an Exploration Dashboard Workspace
2.2. Step 2: Add Projects to Exploration Dashboard
2.3. Step 3: Launch Connections and Compile the Projects
2.4. Step 4: Import and Analyze Timing Summary Reports
2.5. Step 5: Analyze the Results of Report Timing
2.6. Step 6: Disconnecting Interactive Connections
Visible to Intel only — GUID: nug1729887355085
Ixiasoft
3.1.3. Step 3: Import Generated Compilation Databases
To import a compilation database into an empty workspace, follow these steps:
- In the Exploration Dashboard Task list, double-click Import workspaces.
Figure 28. Import Workspaces
- Select the databases to import from the list. The Confirm ID Substitution Pattern dialog box opens.
- Retain the default settings for ID Replacement Pattern. You can optionally alter the naming pattern in this field. To confirm the additions to the Exploration Dashboard workspace, click OK.
Figure 29. ID Replacement Pattern
Figure 30. Imported Compilation Databases
- Exploration Dashboard organizes the reports from each project. To open the reports, expand each project folder, then the Analysis Reports folder. The reports imported from databases generated during compilation are available.
Figure 31. Analysis Reports for seed_1