Visible to Intel only — GUID: ere1708459979803
Ixiasoft
2.1. Step 1: Create an Exploration Dashboard Workspace
2.2. Step 2: Add Projects to Exploration Dashboard
2.3. Step 3: Launch Connections and Compile the Projects
2.4. Step 4: Import and Analyze Timing Summary Reports
2.5. Step 5: Analyze the Results of Report Timing
2.6. Step 6: Disconnecting Interactive Connections
Visible to Intel only — GUID: ere1708459979803
Ixiasoft
5. Document Revision History of AN 1006: Multi-Project Analysis with Exploration Dashboard
Document Version | Quartus® Prime Version | Changes |
---|---|---|
2024.11.18 | 24.3 |
|
2024.04.01 | 24.1 | First version of document. |