Visible to Intel only — GUID: nic1729894195488
Ixiasoft
2.1. Step 1: Create an Exploration Dashboard Workspace
2.2. Step 2: Add Projects to Exploration Dashboard
2.3. Step 3: Launch Connections and Compile the Projects
2.4. Step 4: Import and Analyze Timing Summary Reports
2.5. Step 5: Analyze the Results of Report Timing
2.6. Step 6: Disconnecting Interactive Connections
Visible to Intel only — GUID: nic1729894195488
Ixiasoft
3.2. Using Exploration Dashboard in Batch Mode
The following steps describe how to use batch mode with a group of projects in Exploration Dashboard to simultaneously analyze the compilation results.