Visible to Intel only — GUID: yzh1708459264127
Ixiasoft
2.1. Step 1: Create an Exploration Dashboard Workspace
2.2. Step 2: Add Projects to Exploration Dashboard
2.3. Step 3: Launch Connections and Compile the Projects
2.4. Step 4: Import and Analyze Timing Summary Reports
2.5. Step 5: Analyze the Results of Report Timing
2.6. Step 6: Disconnecting Interactive Connections
Visible to Intel only — GUID: yzh1708459264127
Ixiasoft
2. Exploration Dashboard Multi-Project Analysis Tutorial Steps
The following tutorial steps describe how to open a group of projects in Exploration Dashboard and simultaneously analyze the compilation results from multiple projects within a single GUI.
- Step 1: Create an Exploration Dashboard Workspace
- Step 2: Add Projects to Exploration Dashboard
- Step 3: Launch Connections and Compile the Projects
- Step 4: Import and Analyze Timing Summary Reports
- Step 5: Analyze the Results of Report Timing
- Step 6: Disconnecting Interactive Connections
Figure 2. Exploration Dashboard GUI
Section Content
Step 1: Create an Exploration Dashboard Workspace
Step 2: Add Projects to Exploration Dashboard
Step 3: Launch Connections and Compile the Projects
Step 4: Import and Analyze Timing Summary Reports
Step 5: Analyze the Results of Report Timing
Step 6: Disconnecting Interactive Connections