Intel® Quartus® Prime Pro Edition User Guide: Design Optimization

ID 683641
Date 8/01/2023
Public

A newer version of this document is available. Customers should click here to go to the newest version.

Document Table of Contents

6.2. Optimize Critical Paths

Critical paths are timing paths in your design that have a negative slack and may require optimization. These timing paths can span from device I/Os to internal registers, registers to registers, or from registers to device I/Os.

The slack of a path determines its criticality; slack appears in the timing analysis report, which you can generate using the Timing Analyzer.

Design analysis for timing closure is a fundamental requirement for optimal performance in highly complex designs. The analytical capability of the Chip Planner helps you close timing on complex designs.