Intel® Quartus® Prime Pro Edition User Guide: Design Optimization

ID 683641
Date 8/01/2023
Public

A newer version of this document is available. Customers should click here to go to the newest version.

Document Table of Contents

6.2.1. Viewing Critical Paths

Viewing critical paths in the Chip Planner shows why a specific path is failing. You can see if any modification in the placement can reduce the negative slack. To display paths in the floorplan, perform a timing analysis and display results on the Timing Analyzer.