Cyclone® V GT FPGA Development Kit User Guide

ID 792833
Date 2/21/2024
Public
Document Table of Contents

6.4. The Power Monitor

You can start the Power Monitor application with the following:

  • The Power Monitor button on the Board Test System GUI.
  • The PowerMonitor.exe application that resides in the <install dir>\kits\cycloneVGT_5cgtfd9ef35_fpga\examples\board_test_system directory.