6.1. Preparing to Run the Board Test System
With the power to the board off, perform the following steps:
- Connect the USB cable to the board.
- Ensure that the Ethernet patch cord is plugged into the RJ45 connector.
- Ensure that the development board switches and jumpers are set to the default positions as shown in the Factory Default Switch and Jumper Settings.
- Set the SW4.3 DIP switch to the FACT OFF (logic 1) position.
- To ensure operating stability, keep the USB cable connected and the board powered on when running the demonstration application. The application cannot run correctly unless the USB cable is attached and the board is on.