2. Exploration Dashboard Multi-Project Analysis Tutorial Steps
The following tutorial steps describe how to open a group of projects in Exploration Dashboard and simultaneously analyze the compilation results from multiple projects within a single GUI.
- Step 1: Create an Exploration Dashboard Workspace
- Step 2: Add Projects to Exploration Dashboard
- Step 3: Launch Connections and Compile the Projects
- Step 4: Import and Analyze Timing Summary Reports
- Step 5: Analyze the Results of Report Timing
Figure 2. Exploration Dashboard GUI