Intel® Quartus® Prime Standard Edition User Guide: Debug Tools

ID 683552
Date 9/24/2018
Public
Document Table of Contents

6.3.3. Mapping Internal Signals to the LAI Banks

After specifying the number of banks to use in the Core Parameters settings page, you must assign internal signals for each bank in the LAI.
  1. Click the Setup View arrow and select Bank n or All Banks.
  2. To view all the bank connections, click Setup View and then select All Banks.
  3. Before making bank assignments, right click the Node list and select Add Nodes to open the Node Finder.
  4. Find the signals that you want to acquire.
  5. Drag the signals from the Node Finder dialog box into the bank Setup View.
    When adding signals, use Signal Tap: pre-synthesis for non-incrementally routed instances and Signal Tap: post-fitting for incrementally routed instances
    As you continue to make assignments in the bank Setup View, the schematic of the LAI in the Logical View pane begins to reflect the changes.
  6. Continue making assignments for each bank in the Setup View until you add all the internal signals that you want to acquire.