July 2021 |
2021.07.16 |
- Added note to Early Power Estimator Overview topic.
- Removed occurrences of PowerPlay throughout.
|
February 2017 |
2017.02.21 |
Rebranded as Intel. |
January 2015 |
2015.01.20 |
Added support for MAX 10 devices. |
July 2014 |
2014.07.25 |
- Updated changing the macro security level in Microsoft Excel 2010
- Updated "Main Worksheet", "Logic Worksheet", "RAM Worksheet", "I/O Worksheet", "PLL Worksheet", "XCVR Worksheet", "HPS Worksheet", and "Report Worksheet".
- Added "Enpirion Worksheet" section.
|
June 2013 |
8.0 |
- Updated “PowerPlay Early Power Estimator Overview”.
- Added “HPS Worksheet” section.
- Updated “Thermal Power”, “Power Supply Current”, “Logic Worksheet”, “XCVR Worksheet”, and “IP Worksheet” sections.
- Updated Figure 3–1, Figure 3–2, Figure 3–3, Figure 3–9, Figure 3–11, Figure 3–12, Figure 3–13, Figure 3–15, Figure 3–16, and Figure 3–17.
- Updated Table 2–1, Table 2–2, Table 3–1, Table 3–2, Table 3–4, Table 3–5, Table 3–6, Table 3–13, Table 3–15, and Table 3–16.
- Added Table 3–17.
- Removed power savings information in “Logic Worksheet”, “RAM Worksheet”, “DSP Worksheet”, “I/O Worksheet”, “PLL Worksheet”, “Clock Worksheet”, and “HSDI Worksheet”.
- Removed “Report Power Savings for Each Functional Block” section in the “Report Worksheet”.
|
July 2012 |
7.1 |
Updated Table 3–4 and Table 3–5. |
June 2012 |
7.0 |
- Updated “XCVR Worksheet” section.
- Updated Figure 3–1.
- Updated Table 3–13.
|
January 2012 |
6.0 |
- Added “HMC Worksheet” section.
- Updated “IP Worksheet” section.
- Updated Figure 3–1, Figure 3–2, Figure 3–21, and Table 3–2.
- Added Cyclone V device.
- Added Microsoft Excel 2010 support in “System Requirements” and “Download and Install the PowerPlay Early Power Estimator” sections.
|
August 2011 |
5.0 |
- Updated for the Quartus II software version 11.0 release to include Arria V devices.
- Removed PowerPlay EPE spreadsheet version, power model status, and supported feature information to the PowerPlay Early Power Estimators (EPE) and Power Analyzer page of www.altera.com.
|
May 2011 |
4.0 |
- Added “PLL Worksheet” section.
- Updated “Report Worksheet” section.
- Updated Figure 3–1, Figure 3–9, Figure 3–11, Figure 3–12, Figure 3–13, Figure 3–15, Figure 3–16, and Figure 3–18.
|
December 2010 |
3.0 |
- Updated for the Quartus II software version 10.0 release.
- Added information about Arria II GZ devices.
- Updated Table 1–1, Table 1–2, and Table 1–3.
|
July 2010 |
2.0 |
Updated for the Quartus II software version 10.0 release:
- Added Stratix V device.
- Added “Report Worksheet”.
- Updated “System Requirements”, “Download and Install the PowerPlay Early Power Estimator”, “Entering Information into the PowerPlay Early Power Estimator”, and “Estimating Power Consumption”
- Combining all the worksheets into “PowerPlay Early Power Estimator Worksheets” chapter.
- Updated Table 1–2, Table 1–3, Table 7–2, and Table 11–1.
- Updated Figure 3–1.
- Minor text edits.
|
January 2010 |
1.1 |
Updated Table 1–2 and Table. |
November 2009 |
1.0 |
Initial release. |