Visible to Intel only — GUID: bhc1411109336570
Ixiasoft
Visible to Intel only — GUID: bhc1411109336570
Ixiasoft
SLD Hub Finite State Machine
Because all shifts to VIR and VDR are encapsulated within a DR shift transaction, an additional control signal is necessary to select between the VIR and VDR data paths. The SLD hub uses the USER1 command to select the VIR data path and the USER0 command to select the VDR data path.
This state information, including a bank of enable signals, is forwarded to each of the SLD nodes. The SLD nodes perform the updates to the VIR and VDR according to the control states provided by the sld_hub. The SLD nodes are responsible for maintaining continuity between the TDI and TDO pins.
The figure below shows the SLD hub finite state machine. There is no direct state signal available to use for application design.