Intel® Quartus® Prime Standard Edition: Version 22.1std Software and Device Support Release Notes

ID 683593
Date 12/05/2023
Public

A newer version of this document is available. Customers should click here to go to the newest version.

1.6. Timing Model, Power Model, and Device Status

Table 5.  Timing Model, Power Model, and Device Status for Intel® Arria® 10 Devices
Device Family Device Timing Model Status Power Model Status Device Status
Intel® Arria® 10 10AX016, 10AS016, 10AX022, 10AS022, 10AX027, 10AS027, 10AX032, 10AS032 Final – 16.1 4 5 Final – 17.0 Final – 17.0
10AX048, 10AS048 Final – 16.0.2 5 Final – 17.0 Final – 17.0
10AX057, 10AS057, 10AX066, 10AS066, 10AT090, 10AX090 Final – 16.0.1 5 Final – 16.0.1 Final – 16.0.1
10AX115, 10AT115 Final – 16.0 5 Final – 16.0 Final – 16.0
Table 6.  Timing Model, Power Model, and Device Status for Intel® Cyclone® 10 Devices
Device Family Device Timing Model Status Power Model Status Device Status
Intel® Cyclone® 10 LP 10CL006, 10CL010, 10CL016, 10CL025, 10CL040, 10CL055, 10CL080, 10CL120 Final – 17.0 Final – 17.1 Final – 17.1
Table 7.  Timing Model, Power Model, and Device Status for Intel® MAX® 10 Devices
Device Family Device Timing Model Status Power Model Status Device Status
Intel® MAX® 10 10M02, 10M04, 10M08 Final – 15.1 6 Final – 15.1 Final – 15.1
10M16, 10M25, 10M40, 10M50 Final – 15.1.2 Final – 15.1 Final – 15.1

The current version of the Intel® Quartus® Prime software also includes final timing and power models for the Arria II GX, Arria II GZ, Arria V, Arria V GZ, Arria V SoC, Cyclone IV E, Cyclone IV GX, Cyclone V, Cyclone V SoC, MAX II, MAX II Z, MAX V, Stratix IV, and Stratix V device families. Timing models for these device families became final in the Intel® Quartus® Prime software versions 11.1 or earlier.

4 Devices with a -1 speed grade were finalized in Intel® Quartus® Prime software version 17.0
5 All military grade devices were finalized in Intel® Quartus® Prime software version 18.0.1.
6 Timing model statuses for MAX 10 A6 speed grade parts remain as Preliminary.