Intel® Quartus® Prime Pro Edition User Guide: Partial Reconfiguration

ID 683834
Date 1/11/2022
Public

A newer version of this document is available. Customers should click here to go to the newest version.

Document Table of Contents

3.2.4. Timing Specifications

The following timing diagram illustrates a successful PR operation with the Partial Reconfiguration Controller Intel® FPGA IP. The status[2:0] output signal indicates whether the operation passes or fails. The PR operation initiates upon assertion of the pr_start signal. Monitor the status[] signal to detect the end of the PR operation.
Figure 42.  Timing Specifications