Retime Stage Reports
For
Intel® Stratix® 10 and Intel® Agilex™ designs, the Fitter generates detailed reports showing the results of
the Retime stage, including the Retiming Limit Details report. This report lists the
limiting reason, along with the critical chain and recommendations for the critical
chain for each clock transfer.