Retime Stage Reports
The Fitter generates detailed reports showing the results of the Retime stage, including
the Retiming Limit Details report. This report lists hold violations for short paths
following the Retime stage. The Fitter identifies and corrects the short paths with hold
violations during the Fitter (Finalize) stage by adding routing wire along the
paths.