Finalize Stage Reports

The Finalize stage reports describe final placement and routing operations, including:
  • Programmable Power Technology tile changes:
  • Delay chain summary information
  • Post-route hold fix-up data. The Compiler may report hold violations for short paths following the Retime stage. The Fitter identifies and corrects the short paths with hold violations during the Fitter (Finalize) stage by adding routing wire along the paths.

Figure: Finalize Stage Reports