GTS Transceiver PHY User Guide

ID 817660
Date 4/01/2024
Public

A newer version of this document is available. Customers should click here to go to the newest version.

Document Table of Contents

3.9.1. Bonding Placement Requirements

For the Agilex™ 5 bonding implementation, you must follow the channel placement guidelines shown in the following figure for the channels in the bonded groups (x2, x4, x6, and x8). In the figure, CH0-CH7 are the logical channel number of the various bonded groups.
Figure 56. Bonding Channel Placement Requirement Guidelines